BassGas Project – Yolla A Platform

APS Engineering installed, tested and commissioned an ABB REG615 generator protection relay on Beach Energy's offshore Yolla A Platform in Bass Strait. We delivered a fully tested protection upgrade in a remote, safety-critical setting with minimal disruption to production.

Oil & GasBass Strait, VIC2021
Oil & Gas
Sector
Bass Strait, VIC
Location
Project delivery
Duration
2021
Year
Project overview

The engagement

The Yolla A Platform is an offshore gas production facility in Bass Strait and a key part of the BassGas development, which supplies natural gas to the Victorian market. Beach Energy engaged APS Engineering to install and commission an ABB REG615 protection relay as part of the platform's protection system works. Our engineers delivered the full scope on site, from installation and settings configuration through to secondary injection testing and functional verification. The new relay went into service with every protection function proven.

The challenge

What the site demanded

Offshore assets bring challenges that onshore substations don't. Access to Yolla A is limited and tightly planned, the number of people allowed on the platform is restricted, and every hour of work offshore costs a lot. Beach Energy needed a protection relay installed and commissioned with no rework and the least possible impact on platform operations. Because a protection failure on an offshore gas facility can affect both safety and production, the relay had to be configured and proven correctly the first time, within a short site window.

Scope of work

What APS delivered

  • Pre-mobilisation review of protection drawings, relay settings and test documentation
  • Installation of the ABB REG615 protection relay and associated secondary wiring
  • Configuration and upload of approved protection settings
  • Secondary injection testing of all enabled protection elements
  • Verification of binary inputs and outputs, trip and alarm circuits, and CT/VT circuits
  • Functional and trip testing to circuit breakers
  • Test reports and commissioning documentation handed to the client
Technical solution

How the solution was engineered

APS planned the work so that as much as possible was done before leaving shore. Settings files, test plans and drawings were reviewed and checked before mobilisation, which reduced risk and kept offshore time to a minimum. On site, our engineers installed and wired the REG615, loaded the approved settings, and carried out complete secondary injection testing to confirm that every protection element operated within its specified pickup and timing tolerances. We then ran end-to-end functional checks, including I/O verification, trip circuit testing and alarm signalling, to prove the relay worked correctly within the platform's wider protection and control system. All work followed Beach Energy's offshore safety and permit-to-work requirements.

Outcome

How it landed

The REG615 relay was installed, tested and commissioned within the planned offshore window and handed over in full working order. Beach Energy received a fully documented, verified protection system for the Yolla A Platform, with complete test records for its asset management and compliance needs. The project showed that APS can deliver specialist protection work safely and efficiently in remote, high-consequence offshore environments.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • ABB REG615 Generator Protection Relay
  • ABB PCM600 Protection and Control IED Manager
  • Secondary injection test set (confirm model, e.g. Omicron CMC 356)

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Battery energy storage system at Broadsound, Queensland, tested and commissioned by APS Engineering

    Renewables Broadsound, QLD 2026

    Broadsound BESS – Testing & Commissioning

    APS Engineering, working with JTMEC, delivered testing and commissioning for a battery energy storage system (BESS) at Broadsound in Central Queensland for Yurika. Our work helps strengthen Queensland's grid with new energy storage.

    • SCADA and Automation
    • Digital Substations
    • Testing and Commissioning of Power Systems
    View Project
    MREH

    Renewables Plumpton, VIC 2024

    Melbourne Renewable Energy Hub (MREH) – Testing & Commissioning

    APS Engineering supported Samsung with testing and commissioning at the Melbourne Renewable Energy Hub in Plumpton, one of Australia's largest battery energy storage projects. Our work helped bring critical grid-scale storage online for Victoria.

    • SCADA and Automation
    • Operations and Maintenance
    • Digital Substations
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.