Broadsound BESS – Testing & Commissioning

APS Engineering, working with JTMEC, delivered testing and commissioning for a battery energy storage system (BESS) at Broadsound in Central Queensland for Yurika. Our work helps strengthen Queensland's grid with new energy storage.

RenewablesBroadsound, QLD2026
Renewables
Sector
Broadsound, QLD
Location
Project delivery
Duration
2026
Year
Project overview

The engagement

Battery energy storage is playing a growing role in Queensland's energy transition, helping to firm renewable generation and support grid stability. APS Engineering, working with JTMEC, delivered testing and commissioning for a BESS project at Broadsound in Central Queensland for Yurika. Our team verified the protection and electrical systems to support safe energisation and connection.

The challenge

What the site demanded

BESS projects bring together batteries, inverters, transformers and HV switchgear, all of which must be protected and coordinated with the network. Connection requirements are strict, and commissioning runs to a tight program with multiple contractors on site. The project needed protection engineers who could deliver accurate results and clear documentation to keep the project moving.

Scope of work

What APS delivered

  • Review of protection settings and design documentation
  • Secondary injection testing of HV protection relays
  • CT and VT testing
  • Trip, intertrip, interlock and alarm functional testing
  • Energisation and connection support
  • Commissioning documentation
Technical solution

How the solution was engineered

APS worked within JTMEC's commissioning program, planning tests around construction completion. Our engineers tested protection relays against approved settings, verified instrument transformers and proved trip and interlock schemes across the HV system. We supported energisation and provided documentation to meet Yurika's and network connection requirements.

Outcome

How it landed

The BESS protection systems were commissioned to support energisation, contributing new storage capacity to Queensland's grid. The project expanded APS's renewable energy and BESS portfolio.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • HV switchgear
  • Protection relays (confirm makes/models)
  • Secondary injection test set (confirm model, e.g. Omicron CMC 356)

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    MREH

    Renewables Plumpton, VIC 2024

    Melbourne Renewable Energy Hub (MREH) – Testing & Commissioning

    APS Engineering supported Samsung with testing and commissioning at the Melbourne Renewable Energy Hub in Plumpton, one of Australia's largest battery energy storage projects. Our work helped bring critical grid-scale storage online for Victoria.

    • SCADA and Automation
    • Operations and Maintenance
    • Digital Substations
    View Project
    Stubbo Solar Farm in New South Wales, where APS Engineering tested and commissioned protection systems

    Renewables Central West, Dubbo, NSW 2024

    Stubbo Solar Farm Substation – Protection & SCADA Testing and Commissioning

    APS Engineering, working with Zinfra on behalf of Transgrid, delivered an engineering review, IEC 61850 SCADA signal testing, and full protection factory acceptance testing (FAT) and site acceptance testing (SAT) for the Stubbo Solar Farm Substation. testing and commissioning of protection systems in dubbo, New South Wales. Our work helped bring a major utility-scale solar project online.

    • Testing and Commissioning of Power Systems
    • SCADA and Automation
    • Secondary Design and Engineering
    View Project
    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.