How we approach power system integration

Most problems at energisation happen at the interfaces between equipment from different suppliers and disciplines. We review designs and interface schedules, check signal and protection interfaces, and coordinate primary, secondary, SCADA and grid-connection requirements.
We then verify the integrated system through FAT, SAT and end-to-end testing, and support energisation, so new and upgraded plant works as a single coordinated system from day one.