22 kV Substation Testing & Commissioning

APS Engineering, working with CJP, tested and commissioned 22 kV electrical equipment at Cargill's Narrabri facility. The project delivered a proven, reliable HV supply to support the site's processing operations.

Marine & PortsNarrabri, NSW2020
Marine & Ports
Sector
Narrabri, NSW
Location
Project delivery
Duration
2020
Year
Project overview

The engagement

Cargill's Narrabri facility in north-west New South Wales is an important agricultural processing site in the region. APS Engineering was engaged by CJP to test and commission the 22 kV electrical equipment supplying the site. Our work covered protection relay testing, primary equipment checks and functional verification ahead of energisation.

The challenge

What the site demanded

Processing plants depend on a stable HV supply, and unplanned outages can stop production and affect product. The site's regional location meant the commissioning team had to be self-sufficient and arrive fully prepared. CJP needed a reliable partner to complete the 22 kV commissioning correctly the first time and to program.

Scope of work

What APS delivered

  • Review of protection settings and drawings
  • Secondary injection testing of 22 kV protection relays
  • CT/VT testing and insulation resistance testing
  • Circuit breaker testing
  • Trip, interlock and alarm functional testing
  • Energisation support and commissioning reports
Technical solution

How the solution was engineered

APS prepared thoroughly before mobilising, reviewing settings and drawings so site time could be used efficiently. On site, our engineers tested each protection relay against its approved settings, verified instrument transformers and circuit breakers, and carried out full functional testing of trip and interlock schemes. We then supported energisation and confirmed the system was operating correctly.

Outcome

How it landed

The 22 kV equipment was commissioned successfully, giving Cargill a reliable, fully verified HV supply for its Narrabri operations. All results were documented and handed over to support ongoing maintenance and compliance.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • Secondary injection test set (Omicron CMC 356)
  • CPC 100
  • CT Analyser

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    Schneider Electric and Reyrolle Argus protection relay maintenance testing at a Melbourne logistics facility

    Marine & Ports Melbourne, Victoria, Australia 2027

    DP World Logistics – Protection Relay Maintenance & Operational Testing

    APS Engineering undertook maintenance and operational testing of Schneider Electric and Reyrolle Argus protection relays at a Melbourne logistics facility. The work focused on assessing relay operation as part of the site’s electrical maintenance activities, supporting informed decisions about protection-system reliability and ongoing asset maintenance.

    • Operations and Maintenance
    • Testing and Commissioning of Power Systems
    View Project
    ABB REM615 motor protection relay on a 3.3 kV switchboard panel at Air Liquide Botany, Banksmeadow NSW

    Marine & Ports Banksmeadow, NSW 2022

    Air Liquide Botany

    APS Engineering tested and commissioned a 3.3 kV switchboard panel fitted with an ABB REM615 motor protection relay at Air Liquide's Botany facility. The work gave the site a verified, reliable protection scheme for its high-voltage motor drives.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.