DP World Logistics – Protection Relay Maintenance & Operational Testing

APS Engineering undertook maintenance and operational testing of Schneider Electric and Reyrolle Argus protection relays at a Melbourne logistics facility. The work focused on assessing relay operation as part of the site’s electrical maintenance activities, supporting informed decisions about protection-system reliability and ongoing asset maintenance.

Marine & PortsMelbourne, Victoria, Australia2027
Marine & Ports
Sector
Melbourne, Victoria, Australia
Location
Project delivery
Duration
2027
Year
Project overview

The engagement

APS Engineering carried out protection relay maintenance and operational testing for the DP World Logistics project in Melbourne. The work involved installed Schneider Electric and Reyrolle Argus protection relays used within the facility’s electrical infrastructure. Protection relays form an important part of electrical distribution systems, helping monitor operating conditions and respond to faults according to their configured functions. The maintenance activity focused on assessing relay operation and supporting the continued management of the site’s protection equipment. In a busy logistics environment, maintaining dependable electrical protection is important for equipment safety, asset reliability and the continuity of day-to-day operations.

The challenge

What the site demanded

The site required maintenance and operational testing of its installed protection relays, including equipment from Schneider Electric and the Reyrolle Argus range. Different relay families can have different operating characteristics and maintenance requirements, so their functionality needs to be assessed with the appropriate technical understanding. Reliable electrical protection is important for managing faults and reducing the risk of equipment damage and operational interruptions. The project therefore called for a focused assessment of relay operation as part of the facility’s ongoing electrical maintenance activities.

Scope of work

What APS delivered

  • Maintenance activities involving installed Schneider Electric protection relays.
  • Operational testing of Schneider Electric protection relays.
  • Maintenance activities involving installed Reyrolle Argus protection relays.
  • Operational testing of Reyrolle Argus protection relays.
  • Assessment of relay operating behaviour to support the site’s electrical maintenance scope.
Technical solution

How the solution was engineered

APS Engineering focused the maintenance and operational testing on the Schneider Electric and Reyrolle Argus protection relays installed at the Melbourne facility. The work centred on assessing device operation within the site’s existing electrical protection arrangements. As the relays belong to different product families, their respective functional characteristics and protection roles were relevant to the assessment. Reviewing relay operating behaviour during maintenance helps provide practical information for ongoing protection-system management and can identify areas requiring further attention. This focus on installed protection equipment is important for logistics facilities, where dependable electrical distribution supports day-to-day operations. The activity formed part of the site’s maintenance program and provided a basis for planning any additional checks or follow-up work arising from the testing.

Outcome

How it landed

APS Engineering completed the stated maintenance and operational testing scope involving Schneider Electric and Reyrolle Argus protection relays at the Melbourne facility. The work supported the site’s electrical maintenance program and helped assess the operational behaviour of installed protection equipment. By focusing on relay functionality, the project contributed to informed maintenance planning and ongoing management of protection assets. The testing also provided a basis for determining whether further checks or follow-up maintenance were required.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • Schneider Electric protection relays
  • Reyrolle Argus protection relays
  • Facility electrical protection and distribution systems

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    ABB REM615 motor protection relay on a 3.3 kV switchboard panel at Air Liquide Botany, Banksmeadow NSW

    Marine & Ports Banksmeadow, NSW 2022

    Air Liquide Botany

    APS Engineering tested and commissioned a 3.3 kV switchboard panel fitted with an ABB REM615 motor protection relay at Air Liquide's Botany facility. The work gave the site a verified, reliable protection scheme for its high-voltage motor drives.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Hyperscale data centre power room

    Transport Pascoe Vale, VIC 2023

    Yarra Trams Substation Testing & Commissioning

    Working with CJP, APS Engineering tested and commissioned electrical and protection equipment at a Yarra Trams site in Pascoe Vale. The work supports a reliable power supply for Melbourne's tram network.

    • Equipment Rentals
    • Primary Design and Engineering
    • Testing and Commissioning of Power Systems
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.