Kestrel Coal Mine REF615 Relay Replacement

APS Engineering replaced ageing protection relays with modern ABB REF615 feeder protection relays at Kestrel Coal's underground mine. We delivered the replacement, testing and commissioning with minimal disruption to production.

MiningEmerald, QLD2023
Mining
Sector
Emerald, QLD
Location
1 week
Duration
2023
Year
Project overview

The engagement

Kestrel is an underground coal mine near Emerald in Queensland's Bowen Basin. To improve the reliability and supportability of its HV protection, Kestrel Coal Resources engaged APS Engineering to replace existing relays with ABB REF615 feeder protection relays. Our team handled the relay replacement, settings configuration, testing and commissioning.

The challenge

What the site demanded

Older protection relays become harder to support over time, as spare parts and technical support are no longer available, which increases the risk of failure. In an underground mine, protection reliability directly affects personnel safety and production. Kestrel needed the relays replaced and recommissioned within short shutdown windows, with each feeder returned to service fully proven.

Scope of work

What APS delivered

  • Review of existing protection settings and wiring
  • Settings conversion and configuration for the ABB REF615
  • Removal of existing relays and installation of REF615 relays
  • Wiring modifications to suit the new relays
  • Secondary injection testing of all enabled protection elements
  • Trip, interlock and alarm functional testing
  • Updated documentation and commissioning reports
Technical solution

How the solution was engineered

APS reviewed the existing protection schemes in detail and converted the settings for the REF615 platform before arriving on site, so shutdown time was spent on installation and testing rather than engineering. Each relay was installed, wired and configured, then fully tested by secondary injection to confirm correct pickup and timing. Functional testing through to the circuit breakers proved every feeder before it was returned to service, and drawings and records were updated to reflect the new installation.

Outcome

How it landed

The relay replacement was completed within the planned shutdown windows, and each feeder was returned to service with modern, fully supported protection. Kestrel gained improved reliability, better fault recording and diagnostics, and a protection system that can be supported for years to come.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • ABB REF615 Feeder Protection Relay
  • Secondary injection test set (Omicron CMC 356)

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Data hall with UPS infrastructure

    Mining Emerald, QLD 2025

    Ensham Mine Protection Relay Retrofit Upgrade

    APS Engineering delivered a protection relay retrofit upgrade at Ensham Mine, replacing legacy relays with modern numerical protection. The upgrade improved reliability and supportability across the mine's electrical network.

    • Equipment Rentals
    • Primary Design and Engineering
    • SCADA and Automation
    View Project
    APS Engineering technician testing an ABB REG615 protection relay on the Yolla A offshore gas platform, Bass Strait

    Oil & Gas Bass Strait, VIC 2021

    BassGas Project – Yolla A Platform

    APS Engineering installed, tested and commissioned an ABB REG615 generator protection relay on Beach Energy's offshore Yolla A Platform in Bass Strait. We delivered a fully tested protection upgrade in a remote, safety-critical setting with minimal disruption to production.

    • Testing and Commissioning of Power Systems
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.