CDC Laverton – 66/11kV Substation IEC 61850 -2026

APS Engineering completed protection relay configuration, protection testing, and SCADA testing for the Canberra Data Center (CDC) Laverton 66/11 kV substation, covering 18 protection panels within one month.

Data CentresMelbourne, VIC2026
Data center
Sector
Melbourne, VIC
Location
4 weeks
Duration
2026
Year
Project overview

The engagement

APS Engineering provided functional checks, protection, control, and SCADA engineering services for the CDC Laverton 66/11 kV substation. The project involved schematic verification, protection relay configuration across GE, MiCOM, and Siemens platforms, IEC 61850 configuration, and protection testing for line, transformer, and busbar protection systems. APS Engineering also carried out SCADA testing and completed approximately 18 protection panels within one month, supporting the project’s commissioning and delivery requirements.

The challenge

What the site demanded

The project involved resolving busbar protection relay configuration issues where the initial settings did not meet the required protection criteria. Additional coordination was required between the engineering and electrical teams to ensure relay configuration, panel wiring, and testing activities were carried out without interfering with other ongoing work.

Scope of work

What APS delivered

  • Review of FAT procedures, protection settings and drawings
  • Secondary injection testing of protection relays
  • Control and logic functional testing
  • IEC 61850 signal configuration and verification
  • Verification against project specification
  • SCADA checks
  • Recording and tracking of defects and close-out
  • FAT reports
Technical solution

How the solution was engineered

APS Engineering reviewed the busbar protection relay settings against the project protection requirements and identified configuration discrepancies. The relay settings and logic were corrected and verified against the approved schematics and protection criteria. Point-to-point wiring checks and functional protection testing were performed to confirm correct signal mapping, trip logic, and relay operation. The engineering and electrical teams coordinated configuration, wiring verification, and testing activities to minimise interference with other ongoing site work.

Outcome

How it landed

APS Engineering successfully completed the protection and control testing activities, ensuring relay configurations, panel wiring, communication signals, and SCADA functions met the project requirements. All 18 protection panels and SCADA systems passed Factory Acceptance Testing (FAT) and were approved for delivery. The work was completed within one month through effective coordination between the engineering and electrical teams.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • Protection relays - GE, MICOM, Siemens
  • Secondary injection test set - Omicron CMC 356, Omicron CMC 500

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    Solar farm with collector substation

    Data Centres Sydney, NSW 2024

    NEXTDC Data Centre Testing & Commissioning

    APS Engineering, working with Heyday, tested and commissioned high-voltage electrical and protection systems for NEXTDC data centre infrastructure in Sydney. Our work supported the high-availability power systems that data centres demand.

    • SCADA and Automation
    • Digital Substations
    View Project
    arc-flash-testing

    Data center Sydney 2026

    Macquarie Park - Arc Flash Protection Scheme Testing

    APS Engineering carried out testing of the VAMP arc flash protection scheme at Macquarie Park, including VAM 12L and VAM 4C modules, to verify arc fault detection, protection logic and trip functionality.

    • Testing and Commissioning of Power Systems
    • Power System Integration
    • Secondary Design and Engineering
    View Project
    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.