Project overview

The engagement

APS Engineering undertook testing of the arc flash protection system at Macquarie Park, Sydney. The scope focused on the VAMP protection scheme, including VAM 12L light detection modules and VAM 4C current measurement modules. The testing was carried out to assess the functionality of the protection system, verify its response to simulated arc fault conditions and check the operation of the associated protection logic and trip signals. This work supports the safe and reliable operation of the electrical switchgear.

The challenge

What the site demanded

The project required verification of the arc flash protection scheme to ensure reliable fault detection and correct operation of the associated protection devices. As arc flash incidents can cause significant equipment damage and pose serious safety risks, it was important to assess the performance of the light and current detection modules and verify the protection system’s ability to initiate the appropriate trip response.

Scope of work

What APS delivered

  • Testing of VAM 12L arc light detection modules.
  • Testing of VAM 4C current measurement modules.
  • Verification of arc light detection and current sensing functionality.
  • Functional testing of the arc flash protection logic.
  • Verification of trip signal operation and protection response.
  • Review of the protection scheme’s overall functionality.
Technical solution

How the solution was engineered

APS Engineering applied a systematic testing approach to assess the VAMP arc flash protection system. The VAM 12L modules were assessed for arc light detection functionality, while the VAM 4C modules were tested for current sensing and protection response. The testing focused on verifying the interaction between light detection, current criteria and trip logic under simulated fault conditions. This approach helped assess the protection scheme’s ability to respond to arc faults and initiate the appropriate trip signals, supporting personnel safety and equipment protection.

Outcome

How it landed

APS Engineering completed the testing scope for the VAMP arc flash protection scheme at Macquarie Park, covering the VAM 12L and VAM 4C modules and associated protection functionality. The testing provided an assessment of the system’s fault detection and trip logic, supporting the reliability of the switchgear protection system and helping reduce risks associated with arc flash incidents

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • • VAMP arc flash protection system
  • • VAM 12L – arc light detection I/O module
  • • VAM 4C – current measurement I/O module
  • • Arc flash detection sensors
  • • Protection and trip circuits
  • • Electrical switchgear

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    Aerial view of an illuminated mine at night

    Marine & Ports Narrabri, NSW 2020

    22 kV Substation Testing & Commissioning

    APS Engineering, working with CJP, tested and commissioned 22 kV electrical equipment at Cargill's Narrabri facility. The project delivered a proven, reliable HV supply to support the site's processing operations.

    • Equipment Rentals
    • Primary Design and Engineering
    • SCADA and Automation
    View Project
    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    New 22 kV high-voltage switchboard commissioned by APS Engineering at the Woolworths distribution centre, Dandenong VIC

    Utilities Dandenong, VIC 2022

    Woolworths Distribution Centre

    APS Engineering tested and commissioned a new 22 kV high-voltage switchboard for a Woolworths distribution centre in Dandenong, working with Apex Electrical Contracting. The switchboard was energised safely and on schedule, ready to support the facility's operations.

    • Operations and Maintenance
    • Testing and Commissioning of Power Systems
    View Project
    Let's talk

    Have an asset to test, commission or audit?

    Send a sketch, an SLD or just a paragraph. Our engineering team will reply within one business day with a scope, fee and mobilisation plan.