Project overview

The engagement

Woolworths' distribution centres are vital links in its supply chain, moving goods to stores across Victoria every day. For a new 22 kV high-voltage switchboard at the Dandenong distribution centre, APS Engineering worked with Apex Electrical Contracting to deliver the testing and commissioning. Our scope covered protection relay testing, primary equipment checks and full functional verification before the switchboard was connected to the network.

The challenge

What the site demanded

A large distribution centre depends on reliable power for refrigeration, automation and logistics systems, so any energisation delay or electrical fault directly affects the supply chain. The new 22 kV switchboard had to be fully proven and meet network connection requirements before energisation. The electrical contractor needed a specialist commissioning partner who could carry out the HV testing and protection verification to a tight construction program.

Scope of work

What APS delivered

  • Review of protection settings, single-line diagrams and schematics
  • Protection relay settings upload and secondary injection testing
  • CT and VT testing (ratio, polarity, insulation resistance)
  • Circuit breaker timing and contact resistance testing
  • HV insulation resistance and pressure testing of switchgear
  • Interlock, control, trip and alarm functional testing
  • Energisation support and commissioning documentation
Technical solution

How the solution was engineered

APS worked closely with Apex Electrical Contracting to plan the commissioning around the construction program. Our engineers carried out primary testing of the switchgear, circuit breakers and instrument transformers, followed by secondary injection testing of each protection relay against the approved settings. Complete functional tests proved trip, interlock and alarm logic across the switchboard. With all results reviewed and documented, APS supported the energisation and confirmed correct operation under load.

Outcome

How it landed

The 22 kV switchboard was energised safely and in line with the project program, providing a reliable HV supply to the distribution centre. Woolworths and Apex received a complete commissioning record covering every test performed, giving confidence in the installation and a baseline for future maintenance.

Under the hood

Services applied, equipment used, standards engineered against

A traceable record of which APS services were on this engagement, which calibrated kit it ran on, and which codes the work was witnessed against.

Equipment used

  • 22 kV HV switchboard
  • Protection relays (confirm makes/models)
  • Secondary injection test set (confirm model, e.g. Omicron CMC 356)
  • Circuit breaker analyser
  • HV insulation / pressure test set

Standards

    More from the portfolio

    Other recent work

    Adjacent engagements across the same disciplines and sectors

    APS Engineering specialists testing 11 kV switchgear at the Lihir gold mine, Papua New Guinea

    Mining Lihir Island, New Ireland Province, PNG 2026

    Lihir Gold Mine

    APS Engineering deployed 21 specialists to the Lihir gold mine in Papua New Guinea to deliver an 11 kV switchgear upgrade, plant-wide maintenance and testing works, an engineering review, and site acceptance testing. We worked with Voltex to deliver the works.

    • Power Asset Inspections
    • Equipment Rentals
    • Primary Design and Engineering
    View Project
    APS Engineering technician testing an ABB REG615 protection relay on the Yolla A offshore gas platform, Bass Strait

    Oil & Gas Bass Strait, VIC 2021

    BassGas Project – Yolla A Platform

    APS Engineering installed, tested and commissioned an ABB REG615 generator protection relay on Beach Energy's offshore Yolla A Platform in Bass Strait. We delivered a fully tested protection upgrade in a remote, safety-critical setting with minimal disruption to production.

    • Testing and Commissioning of Power Systems
    View Project
    Battery energy storage system at Broadsound, Queensland, tested and commissioned by APS Engineering

    Renewables Broadsound, QLD 2026

    Broadsound BESS – Testing & Commissioning

    APS Engineering, working with JTMEC, delivered testing and commissioning for a battery energy storage system (BESS) at Broadsound in Central Queensland for Yurika. Our work helps strengthen Queensland's grid with new energy storage.

    • SCADA and Automation
    • Digital Substations
    • Testing and Commissioning of Power Systems
    View Project